The project
A project handled from start to finish: from preparing the ground to the final landscaping around the shed. The site was first dug and levelled, then a gravel bed and a slab were laid to support the construction.
Power was run to the shed and connected to the electrical panel, with lighting and sockets fitted inside. The shed was then assembled and its roof installed.
To finish, soil was brought in and levelled around the shed, the old trees on the plot were removed, and two fruit trees were planted in their place.
The connection to the electrical panel was carried out in coordination with a licensed professional.